2008 FFY Bridge Cost Data Book - Full Version

ODOT Info - A&E Consultants odot_ae_consultant_info at listsmart.osl.state.or.us
Thu May 14 11:56:11 PDT 2009


This is a resend to correct the dates covered in the 2008 Cost Data
Book. It covers projects through September 2008, not 2009...BJ

Below is a link to the PDF version of the full Bridge Cost Data 2008
book. The data includes layout sheets and project bid summaries for all
bridge and structure projects from October 1, 2007 to September 30, 2008
with a few exceptions listed below. 

	This year we included only projects that were let under the 2002
Oregon Standard Specifications for Construction. So, we inlcuded the
following projects that were let after October 2008:

	C13946, 223rd Undercrossing, Sandy Blvd. - Bridge Street, Bridge
#20321, Multnomah County, let 10/9/2008, listed under Miscellaneous.
Also included in under the same contract are 3 retaining walls, Bridge
#20322, 20323, 20324. 

	C13958, N Fork Owyhee River (Fenwick Ranch Road), Bridge #20769,
steel girders, County bridge, let 11/13/2008. This one will be included
in the Federal 2009 Deck Unit Cost Report.

	C13959, Retaining Wall, Cast-in-place Concrete, let 11/13/2008.

	C13967, Morrison Bridge Ped/Bike Access Project, Bridge #02758,
02758A, 02758B, 08589Y, adding multi-use-facility, rail retrofit, and
bridge repairs, let 12/11/2008, listed under Miscellaneous. 

	In addition we excluded the followin project that was let in FFY
2008 because it was let under the 2008 Oregon Standard Specifications
for Construction:

	C13944, with 3 Soldier Pile Retaining Walls, Bridge #20932,
20931 and 20930. 

	Next years cost data book will inlcude this project.

.

The full Cost Data Book contains the following:

		We have included typical bridge bid items, wall unit
prices, sign structure unit prices, and design-build price at the
proposal stage.

		Format and data are similar to last year. Project
Control System (PCS) key numbers can be found on the Index pages.

		Bid item costs for the last three years and weighted
average unit costs are included, with the exception of deck area unit
cost excluding Spencer Creek Bridge (#20198) MLK Bridge (#19667), and
Old Winchester Bridge (#00839).

		The pay schedule for Design-Build (DB) projects are
based on values from the proposal stage. The deck area unit costs for DB
are based on substructure, superstructure, and detour costs divided by
deck area.

For the electronic book on line, please go to:

ftp://ftp.odot.state.or.us/Bridge/CostData/CostDataBook2008/cost_data_20
08.pdf
<ftp://ftp.odot.state.or.us/Bridge/CostData/CostDataBook2008/cost_data_2
008.pdf> 

Hyperlinks and bookmarks are also provided within the PDF file for easy
navigation.

For any comments or suggestions for improving the cost data book, or
questions about this year's unit costs, please contact Theresa Yih,
503-986-3498 or Chittirat Amawattana, 503-986-3240, or e-mail us at
Bridge at odot.state.or.us <mailto:Bridge at odot.state.or.us> .

Bruce Johnson

 
 
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <https://omls.oregon.gov/pipermail/odot_ae_consultant_info/attachments/20090514/701d8afa/attachment.html>


More information about the ODOT_AE_Consultant_Info mailing list